Kit includes: 3" x 3-1/2" x 1/2"tall-LabStone Casting, timber risers, (3) ash barrels, boxes, metal support bar, & NBWs
Instructions to Assemble & Weather this Kit Seriously, this is NOT rocket science-it's just some minor assembly and weathering! Measure & remove the track ties that would be across the pit and then cut & glue (CA) the five (5) metal support bars as shown and then cement the NBWs on the outside of the rails in line with the support bars. Measure & cut to fit the two (2) timber risers and cement in place below the track rails. Glue the track in place & check with a track gauge.
Stain the Pit casting with Doctor Ben's Worn Concrete and apply two coats of Doctor Ben's Instant Age Weathering Solution (#1152) diluted 50/50 with Isopropyl Alcohol (70%) allowing the IA to dry between coats & then applied diluted Doctor Ben's Realistic Rust Weathering Solution (#1150) down the steel bars, NBWs, & metal parts. Sprinkle with coal & ash (not included) and you're done. Great Job!
Detail Parts are composed of UNFINISHED/UNASSEMBLED Resin, Wood, Plastic, and/or White Metal parts-Assembly & Finish Required. Assembly using most plastic cements and painting may be completed by hand or an air brush. Want to know how to weather your finished model? Scroll down to find out how! The above image and thumbnail at right best describes this item assembled (required) & its design. The above image/thumbnail best describes this item SIZE, QUANTITY, COLOR, if assembled (required) & its design. Got Questions? Always Ask first!
Select a row below to filter reviews.
5.0